Search
Looking for information on a theatre? There's a separate search for the Theatres Database.
Found 229 results for your search.
-
Planning response
Auditorium alterations at Gallery Studio Theatre
Listed building consent to replace the seating block at Ipswich's Gallery Studio Theatre was supported, providing improved audience comfort and accessibility along with revealing of historic features.
-
Planning response
Change of use of part of Darlington's Majestic Theatre
No objection was raised to the change of use of the ground floor of the Majestic Theatre from a soft play centre to a supermarket, providing it does not impact on access and operations of the theatre above.
-
Planning response
Extension and refurbishments at Darwen Library Theatre
Plans for an extension to provide better access and prominence, and additional facilities within the building, were supported.
-
News story
More than £100k awarded to theatres through our Small Grants Programme
We are delighted to be able to support 21 ambitious theatres with vital projects that will ensure these important cultural spaces can continue to serve their local communities for many years to come.
-
Planning response
Alterations at Wyndham's Theatre
Listed building consent for a number of alterations within the building, including improving accessibility and WC provision, was supported.
-
Planning response
Front of house extension at King's Theatre in Southsea
Planning permission and listed building consent was supported for former shop units to be integrated into the theatre to expand its front of house, improve accessibility and add a secondary performance space.
-
News story
Culture Media and Sport Committee Inquiry on Protecting Built Heritage
Our CEO Joshua McTaggart gave evidence to the committee where he called for greater protection for heritage buildings, including every local authority having a cultural protection strategy.
- Case study Making memories at Leith Theatre
-
Planning response
Extension and alterations at Frome Memorial Theatre
Planning permission for front extensions to provide additional WCs and internal layout changes, and a new lift providing access to all levels was supported.