Planning Responses
We are a statutory consultee in the planning system. Keep up-to-date with our planning responses.
If you need planning advice we can help.
-
Various alterations at The Witham
Planning permission and listed building consent was supported for various works at The Witham in Barnard Castle, including a replacement accessible entry, installation of PV panels.
-
Demolition of Deal's Regent for replacement cinema and new homes
An objection was submitted to plans to redevelop the Regent in Deal, as the replacement building is of much smaller scale to existing without evidence supporting loss of cultural use. The previous scheme utilised the whole building for cinema.
-
New lighting and replacement shopfronts at Blackpool Grand
Listed building consent was supported for the installation of new lighting, repainting of shopfronts and new more sensitive timber fascia signs along the theatre's north elevation.
-
Replacement fire doors paint scheme at Theatre Royal Winchester
Listed building consent for bold redecoration of the theatre's southern elevation and replacement fire doors was supported.
-
Variation of conditions at Lowestoft development
No objection was raised to the variation of planning conditions at a development neighbouring the Marina Theatre, although engagement with the theatre to minimise disruption was urged.
-
Alterations to doors at King's Theatre Southsea
Listed building consent for alterations to four doors to provide greater acoustic insulation was supported.
-
Temporary storage cabins at Theatre Royal Winchester
Temporary planning permission for the siting of two storage containers to the rear of the theatre's fly tower was supported.
-
New signage at Whitefield Garrick Theatre
The installation of a new sign for the theatre was supported.
-
Roof works at Peterborough's Key Theatre
Planning permission was supported for installation of a permanent roof structure, replacing a temporary solution which has been in place since the end of 2023 due to the removal of RAAC panels.
-
Replacement fire door and CCTV at Carlisle's West Walls Theatre
Listed building consent for a new fire door and CCTV with lighting was supported.
-
Roof repairs and maintenance at Lerwick's Garrison Theatre
Listed building consent was supported for re-roofing and replacement downpipes and guttering.
-
Replacement boiler at Glasgow's Pavilion Theatre
Listed building consent for a replacement boiler and related alterations was supported.