Search
Looking for information on a theatre? There's a separate search for the Theatres Database.
Found 706 results for your search.
-
Planning response
Additional WCs and new handrail at the Novello Theatre
The Trust supported listed building consent for conversion of a store room to a new WC block and insertion of handrails on the foyer stairs to improve safety.
-
Planning response
Support for Leeds Grand WC plans after revisions
The Trust was able to support listed building consent for alterations to WCs at balcony and upper balcony level, which added justification for loss of historic cisterns and retained one for display.
-
Planning response
Demarcation studs to entry steps of Sondheim Theatre
The Trust supported listed building consent for the addition of studs to improve safety at the Sondheim Theatre.
-
Planning response
Show signage for West End's Fortune Theatre
Listed building consent for the installation of show signage at the Fortune Theatre was supported. Since 1989 the theatre was home to 'The Woman in Black' but that ended in February. This signage is to promote the current run of 'Operation Mincemeat'.
-
Planning response
Temporary downpipe at Doncaster Grand
The Trust supported listed building consent for installation of a temporary replacement downpipe to prevent further rainwater ingress pending subsequent asbestos removal and reinstatement of the existing downpipe.
-
Planning response
New and replacement signage at National Theatre
Listed building consent for replacement and new signage in association with the refurbishment and change of operator of the Terrace restaurant was supported.
-
Planning response
Replacement windows at Edinburgh Playhouse
Listed building consent for the replacement of some windows within back of house areas was supported due to their poor condition meaning repair is impractical.
-
Planning response
External downlights at Brixton Academy
Planning permission and listed building consent for the installation of downlights for greater visibility of waiting crowds was supported.
-
Planning response
External tannoy system at Brixton Academy
The Trust supported planning permission and listed building consent for installation of speakers linked to a tannoy system for security and safety messages.
-
Planning response
Renewal of permission for additional WCs at Theatre Royal Bath
The Trust again supported listed building consent for internal alterations associated with expanding provision of WCs. A previous application was permitted in 2019 but not taken forward due to the pandemic.