Search

Looking for information on a theatre? There's a separate search for the Theatres Database.

Found 945 results for your search.

  • Planning response Extension for The Yard

    Planning permission for partial demolition and extension of The Yard in London's Olympic Legacy area was supported. It will provide a larger theatre area with new back of house provision, upper-level accessibility, larger bar and an additional studio.

  • Planning response Alterations at Pickering's Kirk Theatre

    Plans for a new side entrance into a lift providing access to a new small performance/rehearsal space within what was the theatre's first floor storage area was supported.

  • Planning response Repair works at Blackpool Grand

    Listed building consent for repairs and repointing at Blackpool Grand was supported.

  • Planning response Container for storage at Hayling Island's Station Theatre

    Planning permission for a container sited to the rear of the theatre for the storage of props and sets was supported.

  • Planning response Roof works at Leeds Grand

    Listed building consent for re-roofing of parts of the rear of Leeds Grand Theatre and Opera House was supported.

  • Planning response Variation of condition at Thorington Theatre

    The Trust supported variation of a planning condition to enable the theatre to operate over an increased number of days annually, as well as a restriction on months to be removed.

  • Planning response New link building at Lowestoft's Marina Theatre

    Planning permission was supported for a three-storey link building between the original theatre and its cafe, community room and offices in a neighbouring modern block. This also enables new lift access and additional WCs.

  • Planning response Replacement of weatherproofing at Manchester Opera House

    Listed building consent was supported for removal of defective liquid plastic weather-proofing and replacement with lead flashing to better protect rendering which has been subject to water damage.

  • Planning response Temporary relocation of kiosks at Edinburgh's King's Theatre

    Listed building consent for re-location of significant kiosks to the theatre's Tudor bar was supported whilst building works are undertaken, in order to protect them.

  • Planning response Permanent change of use to theatre for Slung Low in Leeds

    Planning permission was supported for permanent change of use to a theatre and community facility for Slung Low. They were given a one-year temporary permission in 2022 for highways impacts to be monitored.