Search
Looking for information on a theatre? There's a separate search for the Theatres Database.
Found 510 results for your search.
-
Planning response
Alterations at Brixham Theatre
Planning permission was supported for alterations and repairs to the Town Hall which contains Brixham Theatre, but concern was raised at removal of the theatre's signage.
-
Planning response
Back of house accessibility works at Cambridge's Mumford Theatre
Planning permission for a new external opening and replacement ramp to facilitate better accessibility to the stage was supported.
-
News story
Explore performance spaces near you
This September theatres around the country are opening their doors to the public with a range of events celebrating their architecture and history with Heritage Open Days, Scotland’s Doors Open Days and Open House London.
-
Sponsor
Stage Right Theatre Consultants (SRTC )
SRTC is a theatre consultancy practice offering global experience to regional projects, providing expert services in theatre and venue design and planning, auditoria design, stage engineering, stage lighting, AV and client representation.
-
Planning response
Replacement air handing unit at Camberley Theatre
Planning permission for a replacement re-located air handling unit to be placed within a timber enclosure to the rear of the theatre was supported.
-
Planning response
Alteration to main entrance at Aldeburgh's Jubilee Hall
Planning permission for a new entry canopy and signage at Jubilee Hall was supported.
-
Planning response
Electric charging points at Watermill Theatre
Planning permission for the installation of six electric charging points within the Watermill's car park was supported.
-
Planning response
Roof works at Peterborough's Key Theatre
Planning permission was supported for installation of a permanent roof structure, replacing a temporary solution which has been in place since the end of 2023 due to the removal of RAAC panels.
-
Planning response
Temporary storage cabins at Theatre Royal Winchester
Temporary planning permission for the siting of two storage containers to the rear of the theatre's fly tower was supported.
-
Planning response
Demolition of Deal's Regent for replacement cinema and new homes
An objection was submitted to plans to redevelop the Regent in Deal, as the replacement building is of much smaller scale to existing without evidence supporting loss of cultural use. The previous scheme utilised the whole building for cinema.