Search
Looking for information on a theatre? There's a separate search for the Theatres Database.
Found 858 results for your search.
-
Planning response
Further temporary permission for portakabin at Watermill Theatre
The Trust supported an extension of temporary planning permission for the siting of a portakabin at Watermill Theatre in Bagnor near Newbury which provides additional office space.
-
Planning response
Removal of basement piers at London Palladium
The Trust raised no overall objection to the removal of piers to open out a basement hospitality space, but urged further research due to their non-theatrical significance as they were part of cellars above which the theatre was later built.
-
News story
Feasibility study outlines way forward for Doncaster Grand
The latest report on the Theatre at Risk has found that the building could partly re-open over the next few years once repair works are completed.
-
Planning response
Stage strengthening at London Coliseum
The Trust supported works to strengthen the Coliseum's stage for increased loading in principle subject to submission of an enhanced Heritage Statement better describing changes.
-
Planning response
Temporary downpipe at Doncaster Grand
The Trust supported listed building consent for installation of a temporary replacement downpipe to prevent further rainwater ingress pending subsequent asbestos removal and reinstatement of the existing downpipe.
-
Planning response
Advertisement consent at National Theatre
The Trust raised no objections to the granting of advertisement consent for the installation of new and replacement signage for the National Theatre's Terrace Restaurant.
-
Planning response
Replacement canopy and structure for Cornwall's Sterts Theatre
The Trust supported planning permission for a replacement steel frame and canopy with associated screening to replace Sterts' previous weather-damaged structure.
-
Planning response
Replacement of basement fire doors at Brixton Academy
The Trust sought further information and justification for proposals to replace doors within Brixton Academy's basement to demonstrate removal was necessary and that they were not of historic significance.
-
Planning response
External tannoy system at Brixton Academy
The Trust supported planning permission and listed building consent for installation of speakers linked to a tannoy system for security and safety messages.
-
Planning response
Replacement Circle and Mid-Circle guardrails at Brixton Academy
The Trust raised no objection to replacement of existing guardrails within the Circle level at Brixton Academy.